For Slovenian pharmaceuticals manufacturer LEK, SSI SCHAEFER has completed two warehouse projects in Eastern Europe as a general contractor. The special feature of the reference projects in Strykow near Lodz in Poland and in Ljubljana, Slovenia: In addition to modifications to create a germ-free and dust-free system solution, the objective was to plan an efficient control for the multiple flows of material including end products, semi-finished products and raw materials.

 

In Strylow alone, 1.5 billion tablets and capsules are produced annually. The equipment includes two curve-going storage and retrieval machines per plant. With 24 double cycles per hour – with integrated collision prevention – they ensure efficient inbound and outbound storage. Overall, the objectives were more than met: The production and logistic centre in Strykow is a "21st century project" for the LEK company management.

Project objectives:

  • Reduce warehousing costs and personnel
  • Increase delivery quality
  • Centralisation of distribution and dispatch
  • High availability of articles
  • Automation of the flow of goods in the plant
  • Reduce errors
The project in detail
Our range of products and services:
  • Creation of the logistics concept
  • Implementation planning
  • Pallet conveying technology
  • Storage and retrieval devices
  • High bay warehouse and rack system
  • Visualisation
  • Warehouse management and control system